{Photo3}

South gable enclosed, metal roof started.
Metal roof in progress - 08/04
Finishing up the basement ramp.

Septic system installation.
Double wall construction.
Bay window

R38 Ceiling Insulation (more to be added) 

Greenhouse interior. 

Front door installed - house enclosed! (11/04)

View from the east.
North deck from the east.
Heating system plumbing.

Construction Photos Pages: 1 2 3 4 5          Home