|
South gable enclosed, metal roof started.
|
Metal roof in progress - 08/04
|
Finishing up the basement ramp.
|
|
Septic system installation.
|
Double wall construction.
|
Bay window
|
|
R38 Ceiling Insulation (more to be added) |
Greenhouse interior. |
Front door installed - house enclosed! (11/04) |
|
View from the east.
|
North deck from the east.
|
Heating system plumbing.
|